Reynolds Dryline Logo

Who We Work With

The Leadership Team

John Reynolds

Managing Director

Sean Reynolds

Director of Operations

John Bourne BSc (Hons) MCIOB

Commercial Manager

Steve Carr

Operations and Commercial

Joe Birtwistle BEng (Hons)

Technical Manager

TIMELINE

Our History

Founded in 1963 in Leicester by Leon Reynolds, as a traditional plastering company, the company has evolved with the industry into one of the leading drylining and specialist finishing company’s in the region. The company is now headed by John Reynolds as MD and third generation Sean Reynolds as Director of Operations.

Expects since 1963

Our Projects

Saffron Court, Nottingham

Location:

Nottingham, UK

Contractor:

Winvic

Value:

£3.3m

Completed:

June 2019

Metal Stud Partitioning / Suspended Ceilings / Structural Framing Systems (SFS) / Insulation / Plastering

Vaughan Way – Leicester

Location:

Leicester, UK

Contractor:

Winvic

Value:

£3.8m

Completed:

October 2019

Metal Stud Partitioning / Suspended Ceilings / Structural Framing Systems (SFS) / Insulation / Plastering

Kent Street Baths – Birmingham

Location:

Birmingham, UK

Contractor:

Winvic

Value:

£6.9m

Completed:

On-going

Metal Stud Partitioning / Suspended Ceilings / Structural Framing Systems (SFS) / Insulation / Plastering

Sylvester Street – Sheffield

Location:

Sheffield, UK

Contractor:

Winvic

Value:

£4.7m

Completed:

On-going

Metal Stud Partitioning / Suspended Ceilings / Structural Framing Systems (SFS) / Insulation / Plastering

Blocworks, Queens Road – Nottingham

Location:

Nottingham, UK

Contractor:

Graham

Value:

£3.6m

Completed:

On-going

Metal Stud Partitioning / Suspended Ceilings / Insulation / Plastering

The Residences – Edgbaston

Location:

Edgbaston, UK

Contractor:

Winvic

Value:

£5m

Completed:

On-going

Metal Stud Partitioning / Suspended Ceilings / Structural Framing Systems (SFS) / Insulation / Plastering